Project Overview
The Utility Shop and East Annex Renovations were a two phase renovation to the service space for the employees at Boundary Dam. It was a complex project involving decommissioning of an overhead crane in an existing occupied building, then transforming that existing space into a high use Cafeteria, Locker Room and Office Area for their employee use.
Inherent to all SaskPower projects, schedule was critical. Phase One of this project included the transformation of the Utility Shop into a functional multi-purpose facility. All construction occurred adjacent to the existing and active Main Office Complex, with only a partition wall dividing these two dissimilar processes.
Phase One of this project was required to achieve substantial completion prior to Phase Two work commencing. Resource allocation and consistent management of extended lead time materials was critical to the success of this Phase and inevitably resulted in CCR finishing ahead of schedule. This provide both the Owner and CCR with extra time and comfort going forward to the next stage of the project.
Phase Two (East Annex) included the demolition of an existing Office/ Lunchroom Facility and transforming it into a fully functional Women’s Locker and Shower Room.. This phase included work within the Power Generation Plant, and was also next to occupied offices, labs and testing facilities.
Check out photos of this project below.
Project Gallery
Similar Projects We’ve Done
- SaskPower Poplar River Women’s Locker Room Renovation
- Weyburn Courthouse Revitalization
- Shaunovan New Equipment Storage Building
- SaskPower Wynyard District Service Building
- Department of Highways Cold Storage Building Yorkton
- Estlin Substation Concrete and Civil Works
- Finora Plant Expanstion
- ILTA Belle Plaine
- ILTA Corman Park
- Kamsack New Equipment Storage Building
- PRFA Pesticide Storage Building-Outlook
- SaskPower Poplar River D-Stores Conference Room
- SaskPower Boundary Dam Temporary Lab
- SaskPower Poplar River Power Station Control Annex
- Kerrobert Alliance Pipeline Project
- Ormat Heat Recovery Project
- Russell Metals Crane Extension
- Saskpower Poplar River SBAC Compressor Building
- SaskPower Rush Lake Foundation Installation
- Tantallon Switching Station Control Building Extension
- HMCS Queen Building Office Reno
- SaskPower Ermine Switching Station Control Building
- Shand Boilerhouse Contractor Facility
- SaskPower Boundary Dam Mine Services Building
Quality Building From Start to Finish
CCR Construction Ltd. is a Regina-based company specializing in Construction Management, Design-Build and General Contracting. Our hands-on approach allows us to ensure that our project teams have the ability to make any required decisions and address project issues quickly and decisively.
Say hello.
306.585.1967
1831A Macrae Dr.
Regina, SK
S4N 0S4